27MAY2018
Location:
City Dock Berth #2096 Tampa, FL;
Events:
The replacement radiator arrived by barge during the 1st watch
around 8am and 3 shipyard hands came aboard to also assist us. We offloaded the
broken radiator and an additional old one that was sitting on top of the pump
how for who knows how long. After some serious heaving and hoeing we got the
radiator in place, the fan cowl and guards fitted in, and the hoses attached.
It was no small feat getting it all in place and assembled, but it was better
then sitting around doing nothing all day. The 2nd watch was back to
down-time, and generally killing my phone battery to pass the time.
Things
learned about vessel/barge: How to install a diesel radiator and
tool locations.
Classroom
information application(s): Engineering Familiarization.
Supplemental
Information: Too many chiefs in the teepee made the
installation process longer and more arduous then it should have been, not that
it was a simple task to begin with. I’ll be honest, I enjoy the engineering
work more then the deck work and I may ask to be assigned to the Chief during
my next hitch to train in the engine room more. Lastly, we should be getting
underway for St. James, LA tomorrow afternoon which sounds interesting. I’m
looking forward to seeing the delta and the river from this side, I’ve only
ever crossed it on I-10 East going through LA and once way up near Little Rock,
AK.
Rules
of the Road Scenarios? None Observed.
No comments:
Post a Comment