Wednesday, June 6, 2018


06JUN2018

Location: Chevron USA Terminal Pascagoula, MS and Gulf of Mexico South Mobile, AL en route to Tampa, FL;

Events: We got underway just before the 1st watch, leaving the just the lines to be hauled in and stowed for us as we transited out of Pascagoula. The weather was fair, so we got back to chipping the forward barge containment area and, after replacing a faulty air hose fitting, got several good hours in. The 2nd watch was back to easy time, monitoring the barge and some floor stripping and waxing on the boat.

Things learned about vessel/barge:  Where air hose parts are and how to replace them and repair a line.

Classroom information application(s): Nothing Specific.

Supplemental Information: Today has been a good day, got some solid progress done on the wench, though it’s still got a long way to go. We chased the foul weather out of Pascagoula and thankfully didn’t catch up to it.

Rules of the Road Scenarios? Passing and Crossing in a Channel.



No comments:

Post a Comment