06JUN2018
Location: Chevron
USA Terminal Pascagoula, MS and Gulf of Mexico South Mobile, AL en route to
Tampa, FL;
Events: We
got underway just before the 1st watch, leaving the just the lines
to be hauled in and stowed for us as we transited out of Pascagoula. The
weather was fair, so we got back to chipping the forward barge containment area
and, after replacing a faulty air hose fitting, got several good hours in. The
2nd watch was back to easy time, monitoring the barge and some floor
stripping and waxing on the boat.
Things
learned about vessel/barge:
Where air hose parts are and how to replace them and repair a line.
Classroom
information application(s): Nothing Specific.
Supplemental
Information: Today has been a good day, got some solid
progress done on the wench, though it’s still got a long way to go. We chased
the foul weather out of Pascagoula and thankfully didn’t catch up to it.
Rules
of the Road Scenarios? Passing and Crossing in a Channel.
No comments: