09JUN2018
Location:
Mosaic Terminal, Tampa, FL and departing for St. James, LA;
Events: Towards
the end of the 1st watch the pump repairmen showed up and began the
process of taking the old, broken pump shaft out and installing the new one.
Everyone says they have never seen a shaft break in that way before, so the
cause is still unknown. The 2nd watch was spent completing the
discharge, disconnecting from the terminal, and getting flipped around by a
harbor tug so we could head back out to sea. The lead tankerman again let me
have a longer reign to complete the transfer operations.
Things
learned about vessel/barge: Continued transfer operations.
Classroom
information application(s): Cargo Ops 1 loading and discharging
of product
Supplemental
Information: The repairs went very smoothly which was
a blessed relief considering the unusual nature of the break. Tomorrow is back
the needlegunning that forward wench which I want to have finished before I get
off this boat in the next few days.
Rules
of the Road Scenarios? Crossing and Passing in a Channel.
No comments:
Post a Comment